Friday, April 1, 2011

4/1/11

Four link bars cut to the same length.


Brackets mocked up

Friday, March 25, 2011

3/25/11

Bushings welded in, now spacers need to be made in place of spherical rod end gap.

Friday, February 11, 2011

2/11/11

Bushings to be welded in four link holes.

Friday, February 4, 2011

2/4/11

Four link brackets need to be modified, as you can see by the third hole being filled.

Friday, January 28, 2011

1/28/11

Slots cut for four link bar.