I have been ordering suspension parts. I had a water jet fabrication shop make a inner shock tower piece to adapt to the caster camber plate. Front spindles are at powder coat, should be done on 1-28-2010. Still have to box lower control arms. Below are some pieces I picked up.
Monday, January 25, 2010
Subscribe to:
Posts (Atom)