Tuesday, December 16, 2008

media blast

Car is still at the media blaster. So much for being done by Nov. 15. It isn't even done by December 15. Getting the run around when I call to check progress, and that is only when I can actually get the guy on the phone. Looks like I need to plan a road trip. Progress was slow enough before this without this guy adding another month delay.

Saturday, November 15, 2008

11/14/08 media blast

Wow! I can't believe the cowl is solid

rear sail panel.
somebody must have had an antenna here


The roof is better than I had hoped.


So far things are moving slowly, but better than I expected.

Friday, November 7, 2008

Nov 2

Sid from Midwest Media Blasting picked up the shell on November 2 to take to his shop in Shelby. Should be completed by the 15th (hopefully!). I should have more pictures then to update.

Friday, October 10, 2008

more rust

blew through the cowl while welding and found more rust


removed these pieces...


from here.

had to make access for new part


fitting new part

ready for welding


front view of patch - weld complete

side view patch


put shock tower support braces in


braces are similar to the '69 mustang trans am racers

next stop is media blast and etch prime

Saturday, September 27, 2008

rotisserie

the white paint is the only original left!

seams are going to be welded and structural support added to handle the horsepower


Friday, September 12, 2008

9/12/08

New repop seat riser


Original passenger side seat riser


Seams welded on one piece quarters


Finally! All sheet metal has been repaired or replaced.

Friday, September 5, 2008

passenger side



I'd still like to find the idiot that hacked up the quarter vent!



Monday, June 23, 2008

Friday, May 16, 2008

progress continues

Joy! more rust!

Plasma cutters are the S***!

Rear end gaps and lines looking good


Transition piece in and frame rails tucked under.

One piece floor pan is in after living in the garage for a year and half.

Red bar port-o-jack. Left b-pillar pushed in 1/2 inch needed to be pushed out.

Lines look good in back. Back end is dedicated!(Welded)

Looks like a lot of welding and grinding ahead.

Friday, May 9, 2008

Car moved for structural welding 5-9-08

moved to Scott's shop for lines and structural welding


mocking up

mocking up "R" model front end


headlight buckets and grille attached

fits going well

Scott welding rear frame rail

Tuesday, January 29, 2008

3/9/07

3/9/07
Hung new fenders, door and hood.




Patchwork starts 1/5/07

1/5/07

Driver's side toe kick patch.


Rusted metal removed from driver's side toe kick. Patch fitted.


Rust removed on cowl - passenger side.


Ron welding in first patch metal on front cowl.